BIOMASS PLANT – ANDRIA

Description

Design of an energy cogeneration endothermic plant powered by biomass (vegetable oil) with an output of 7,781 MWE. SINGLE AUTHORISATION (Legislative Decree 387/2003.

Description

DATE
2007-2013
LOCATION
Andria (BT)
CUSTOMER
MAMO NEW ENERGY srl

FOCUS

  • Preliminary design;
  • Final Design (Legislative Decree n. 163/2006 and Presidential Decree n.554/99);
  • Environmental impact assessment
  • Landscape authorisation;
  • Connection works design;
  • Authorisation reports with Enel;
  • Coordination of Authorisation procedures;
  • Technical and administrative testing.